Building Demolition in EdmontonWhole Buildings.
Cleared to Grade.
Whole commercial and light-industrial buildings taken down — permits, utility disconnects, structure, foundations and a cleared, grade-ready site.
The Scope
Building & Structure Demolition
On a redevelopment the demolition permit gates the whole build — in Edmonton it has to be issued before your footing and foundation permit can be released. That makes the front end of a teardown more important than the teardown itself, and it is where most schedules are actually lost.
Who this is for: Developers clearing a site for redevelopment, general contractors on a rebuild, owners removing an end-of-life building, and industrial operators decommissioning plant and support structures.
What's Included
What We Actually Do
Permit path
We walk the development and building permit sequence with you and flag what has to be lodged first so the new build is not waiting on it.
Hazardous materials
Assessment coordinated before anything comes down. Where abatement is required a qualified abatement contractor completes it and we schedule behind their clearance.
Utility disconnects
Gas, power and water confirmed disconnected. The ATCO Gas primary line cutback is the single most common cause of a slipped date — we flag it at the estimate.
Structure down
Sequenced with the site, the neighbours and the access you actually have, with dust and noise controlled.
Foundations & slab
Out and hauled, not buried. Backfilling and site grading to what the next phase needs.
Site handover
Cleared, levelled and ready for survey and layout.

Ready to Mobilize
Give Us a Date.
We'll Hold It.
Experienced commercial crews and our own equipment, staged and ready — including through the winter. Tell us when you need the site and we will tell you straight whether we can hold it.
Book a WalkthroughStraight Answers
Building & Structure Demolition FAQ
How far ahead should we start the permit?
Earlier than feels necessary. The demolition permit gates the footing and foundation permit, and utility disconnects run on the utility's calendar, not yours. We map the sequence at the estimate so nothing sits waiting.
Can you take multi-building sites?
Yes, and that is the scope that suits us best — several structures, one mobilization, one sequence, one clear-down.
What is left at the end?
A cleared, grade-ready site with the debris hauled and the dump fees already inside your number.
Next Step
Send Us the Scope.
Drawings, a unit list or just a site address. Free on-site estimate, one firm number, disposal included.